IKT

IKT – Institute for Underground Infrastructure

Project C347:
Root intrusion into waste-water sewers – passive preventative measures

Posted 06. January 2014
0 Comments

Measures to prevent root intrusion into waste-water conduits, drains/sewers and manholes are to be assessed and recommendations for action derived to assist engineering consultancies involved in the planning of networks. The IKT has researched the fundamental relationships between root growth and underground infrastructure in a number of research projects, and has been involved in the drafting of the (German-language) standard, “Trees, underground conduits and drains/sewers” (published in German as DWA…


Project F219:
Effects of sewer sealing on treatment plants and water balance

Posted 05. January 2014
0 Comments

The effects of high extraneous-water influxes on the following are to be investigated: waste-water treatment performance treatment-plant energy balance the burden on the water environment caused by combined sewer overflow systems The costs caused by extraneous water are to be compared against the costs for refurbishing of sewers and site-drainage pipes. The sustainability of the refurbishing materials and methods used are also to be examined. Possible problems for buildings and…


Project F212:
Root-proof pipe bedding systems

Posted 04. January 2014
0 Comments

A test system was created within the framework of Sub-Project I, “Planting of large trees with an underground test system (root trenches) in Osnabrück”, in order to investigate various bedding materials for their effects on the regeneration of tree roots. Sub-Project II is now pursuing two aims:


Project F208:
Performance analysis of combined sewage treatment plants

Posted 03. January 2014
0 Comments

What technologic equipment do storm-water tanks need to have when current and future requirements are taken into account? What evaluation methods are appropriate for the reliable assessment, using standardised criteria, of the performance of combined sewage treatment plants on the basis of operational data? The storm-water tanks in the German states of Baden-Württemberg and North Rhine-Westphalia will be categorised, to enable analysis of the performance of the tanks. A survey…


Project F207:
Inspection of culverts and pressure pipes

Posted 02. January 2014
0 Comments

This is a two Phase project examining the inspection and condition-surveying of pressure sewer pipes and culverts. In Phase 1, the methods of use, preconditions for use and costs of available technologies for surveying the condition of pressure sewer pipes were collated. Their potential for use in pressure sewer pipes was evaluated and recommendations made. In Phase 2, the emphasis here will be on the implementation of the recommendations for…


Project F206:
Trenchless installation methods for district-heating piping systems

Posted 01. January 2014
0 Comments

Ever greater importance is being attached to the expansion of district-heating networks as energy development progresses. Costs can be saved and resources conserved by installing new piping systems using trenchless technologies. However, the trenchless installation of district-heating systems frequently encounters scepticism due to a lack of basic knowledge about its use. A research consortium consisting of AGFW, IKT and seven other partners, now intends to identify and eliminate existing technical…